In the early part of 2018 both of the refurbished bogies were placed under the tram body which was then lowered onto its mountings.
This was done to allow for the final checks to take place to the bogie position and aligning the various connections to the brake mechanisms, sanders etc.
It is also allowed for accurate assessments to be made of the space available for cable runs and other items that were planned for the refurbishment.